![](https://static.wixstatic.com/media/11062b_49290d29f68c4c989d8bdd24e53bb3d5f000.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/11062b_49290d29f68c4c989d8bdd24e53bb3d5f000.jpg)
Ports
-
Characterization of the appropriate final destination of waste and effluents;
-
Definition of physical and logistical structure for the operation of waste and effluent treatment units;
-
Characterization of measures, equipment, facilities and procedures for control and management;
-
Development of preliminary project/basic project of dredging;
-
Development of sustainable practices for the port reorganization and modernization process;
-
Development of an environmental education, communication and social responsibility program;
-
Development of an environmental monitoring program for the dredging area;
-
Development of an environmental monitoring program for the ocean disposal area;
-
Development of a system for cost composition of dredging works;
-
Preparation of Guide and Good Practice Manuals;
-
Preparation of Technical Notes, reports and opinions;
-
Preparation of an Integrated Plan for the Management of Solid Waste, Liquid Effluents and Harmful Synanthropic Fauna;
-
Preparation of analysis of basic and executive projects for dredging, demolition and monitoring of dredging works and services;
-
Preparation of standard operating procedures (SOP) in conceptual and basic projects;
-
Modeling of Sedimentological Processes (quantification of siltation rates);
-
Technical-scientific support to support inspection, hydrographic surveys and Analysis of Inspection Reports for dredging work.